JNK India ltd - Oil and Gas sector proxy?

INTRODUCTION

  • JNK India Limited was incorporated in 2010 and is engaged in designing, manufacturing, supplying, installing, and commissioning process-fired heaters, reformers, and cracking furnaces (HEATING EQUIPMENTS).

  • The company has a diversified product portfolio that caters to varied industries such as oil and gas refineries, petrochemical, steel, fertilizer, etc.

  • Evolution of the company

Strategic Collaboration with JNK Global

  • Company has strategic collaboration with JNK Global, the renowned industrial-use Process Fired Heater producer in Korea, and it is one of the promoters of JNK India.
  • This provides access to extensive knowledge and resources, fostering innovation and efficiency in JNK India projects.
  • JNK India acts as a global joint engineering and implementing
    partner for JNK Global
    This snippet explaines it well

PROMOTERS

  1. Arvind Kamath


    Arvind Kamath is major promoter of the company and holds 32.65% stack via MASCOT CAPITAL AND MARKETING PRIVATE LIMITED

  2. Goutam Rampelli


    Gautam Rampelli holds 8.34% stack in the company

  3. Dipak Bharuka


    Dipak Bharuka holds 8.92% stack in the company

INDUSTRY OVERVIEW

  • Established business line for the company is in the segment of heating equiments. (Process fired heaters, Steam reformers, Cracking furnaces)
    NOTE: For more technical understanding and product applications, please refer company DRHP here. JNK INDIA LTD-DRHP

  • Demand potential for Indian refinery segment

  • Demand potential from Indian petrochemical segment

  • Demand potential from fertilizer (Urea) segment

So, total demand for heating equipment from Indian refineries, petrochemicals and fertilizer (Urea) segments between Fiscal 2024 and Fiscal 2029 is estimated at ₹ 27,089 crore i.e., approx. ₹ 4500 crore on an annualized basis. 61% of this demand would come from petrochemicals followed by 37% from refineries and 2% from fetilizers (Urea).

Same way, demand for heating equipment from the refineries in the countries of interest between calendar year 2024 and calendar year 2028 would be ₹49,045 crore i.e., approx. ₹ 7256 crore on annualized basis.

COMPETITIVE LANDSCAPE

  • The process fired heaters market has high barriers to entry and there are only a handful of suppliers, despite surge in demand.
  • If the operation of a process fired heater is interrupted for even one day, users could incur significant losses, which is why suppliers undergo a thorough selection process.
  • The Indian heating equipment market is closely competed among seven companies with JNK India and Thermax being the most prominent and comparable players. Bharat Heavy Electricals Limited is also a participant however, its revenue from heating equipment is comparatively lower compared to its other flagship businesses.
  • In terms of revenue from heating equipment, JNK India is the largest company in India with a revenue of more than ₹ 4,000 million in Fiscal 2023.
  • In terms of volume, the company is currently installing 25 units, which is higher than any of its competitors currently executing in the Indian market.
  • Based on discussion held with the leading heating equipment suppliers, approximately ₹ 22,000 million of heating equipment have been ordered in Fiscal 2023.
  • As per Fiscal 2023 orders, company commands 27% market share in heating equipment space in India.
  • At global level, JNK India commands 2% market share and JNK Korea commands 14% market share.

JNK 6

FINANCIALS AND FUTURE GROWTH

  • From FY21 to FY24, revenue has grown at CAGR of 50%+ with OPM margins in the range of 18%-20%.
  • Company has generated positive operating cash flow in 3 out of last 4 years, though cumulative OCF/PAT conversion rate for last 4 years is 39% which seems little low.
  • Company’s current orderbook stands at Rs. 1246 crore as of Q1 FY25.
  • Company’s orderbook was at Rs. 620 crore at the end of FY24, and after getting significant order of close to Rs. 700 crore from Reliance Industries for cracking furnace, orderbook strengthen significantly.
  • Company plans to execute opening orderbook fully plus some portion of new orderbook, so revenue for FY25 will be close to 700 crore with 18% OPM.
  • There is healthy bid pipeline of Rs. 4000 crore and company’s conversion rate stand at 20-25% historically. So there is good visibility for future orders.

RISK FACTORS

  • Company is proxy to Oil and Gas sector growth, so if there is slowdown in capex plans or delay in new projects in this sector, it can affect the orderbook and future visibility of the business.
  • Company has derived majority of revenues from their Corporate Promoter, JNK Global and use their experience and technology support for select projects. Any kind of dissociation with JNK Global may have an adverse impact on their business, results of operations and cash flows.

OTHER NOTES

  • Company recently entered into Flares, Incinerators segment which is 4% of total revenue which I have not covered here in detail. I will add in subsequent comments.
  • Company is also building capabilities in renewable sector with green hydrogen as well through subsidiary JNK Renewable Energy Private Limited, which we need to track going forward.

Disclaimer : Tracking

16 Likes

NOTES AR-FY24

  • Global refining capacity is projected to expand by 3.3 million barrels per day between 2023 and 2030, supported by a simultaneous increase in the supply of non-refined fuels such as biofuels and natural gas liquids (NGLs).

  • Some of the key major projects successfully executed during our journey include:

    1. Successful Commissioning of Crude Heaters and CCR Heaters for Dangote Refinery Heaters (Nigeria).
    2. Commissioning of Methanol Reformer for Assam Petrochemical.
    3. Crude Heaters and Atmospheric Residue Heaters for Pemex, Mexico.
    4. Hydrogen generation and dispensing station at IOCL R&D centre, Faridabad.
  • Company supplied modularised heaters to Nigeria for the largest single-train refinery. This project involved designing and delivering some of the biggest
    heaters ever constructed, showcasing our ability to manage complex, large-scale modularisation tasks with precision and efficiency.

  • We are collaborating with IIT, Mumbai for advanced burner technology, reflecting our commitment to environmental sustainability and innovation.

  • we have added 103 new employees during the year in various functions thereby increasing our team strength to 253 staff members as at end of FY2024. (68% increase in employee strength in a year)

3 Likes

I could be wrong but below are two observations from DRHP which led me to be away from this company.
Risk 1 - We derive a significant portion of our revenue from operations from orders which are contracted to us by Contracting Customers. We have received projects from Contracting Customers such as Tata Projects Limited, and JNK Global, one of our Corporate Promoters. However, we receive majority of our projects from JNK Global. We work with JNK Global as one of our Contracting Customers and thereby cater to various End User Customers including Indian Oil Corporation Limited in India.
My view: Above tells me that company can have a intermediary influenced by promoter or the Korea partner group where the profits could be stored – with no annual report out yet – check for related party transaction in future. Almost 50% of the orders are from JNK Global.
Risk 2 - We are an asset light Company wherein we outsource our fabrication process to third-party fabricators for most of our projects which presents numerous risks.
My View: How can manufacturing company be asset light :blush:,Reason could be that promoter Arvind Kamath has many businesses under brand name Mascot and Porvair so work might be going der for processing and hence needs deeper review.

4 Likes

Recent Management interview.

1 Like

JNK India has shown strong growth in their business for the first half of this financial year. Their revenue grew by 47% compared to last year, reaching INR 1,981 million. The company also secured several new projects, bringing their total pending orders to an all-time high of INR 13,116 million.

One of their biggest achievements was getting their first order from the United States through a company called KBR. This is significant because the US market typically prefers to work with American or European suppliers for such equipment. They also won their first process plant order from HPCL’s Mumbai refinery and secured a project from Adani’s green PVC plant in Mundra.

Most of JNK India’s business comes from making heating equipment, which accounts for 83% of their orders. They mainly serve Indian customers (91% of orders), with petrochemical and refining companies being their biggest clients. The company sees good opportunities ahead, especially in Russia where they could potentially win projects worth INR 2,000 crores.

However, their profit margins have been lower than usual lately. This is because many of their current projects are in the middle or final stages, which typically involve higher costs. They’ve also had some extra expenses from employee stock options (ESOP) and from growing their business. The company expects their margins to improve in the second half of this year as they start working on their new orders.

Looking at the full year, JNK India expects to generate revenue between INR 600-700 crores. They plan to complete all their existing projects worth INR 621 crores this year, with additional revenue coming from new orders. The management is confident about their future, particularly after entering the US market. They’re also expanding into new areas like renewable energy while strengthening their position in their core petrochemicals business.

The employee stock option costs, which have been affecting their profits, will end by March 2025. This, combined with their strong order book and expansion plans, makes the management optimistic about their future performance.

6 Likes

JNK does business with the US and Russia. Does this not make it vulnerable to US sanctions?

JNK got a 1000 + crore order from JNK global, execution to be completed by 2028, roughly 9-10 quarters left for completion. Can expect 100 cr per quarter from this if the project is milestone based.

8 Likes

Good set from JnK India

2 Likes

JNK India Concall Key Highlights (Q3 FY26)


Order Book and Pipeline Status

Management considers a book-to-bill ratio of 2.0 to 2.5 to be the ideal range for the company’s execution timeframe.

Total Order Book ~1,700 Crores* As of January 1, 2026
BPCL Bina (Current) 1,050 Crores Received from JNK Global; 0 revenue booked to date
BPCL Bina (Pending) 400 - 600 Crores Expected within the next two quarters
Chemist JV Subsidiary ~100 Crores Focused on green hydrogen and sustainable fuels
Middle East Project 200 - 250 Crores Waste gas handling; expected to finalize in Q4 FY26
Domestic Clean Fuel 200 - 250 Crores Technically qualified; negotiations ongoing
  • The joint venture with Chemist Group generated 23 crores in revenue in its first quarter of operations. It is expected to contribute 10% to 15% of total revenue over the next few years.

  • Current capacity utilization is at 70%. Physical shop space is not a bottleneck, the limits are engineering manpower and financial/banking limits.

  • The company has 500 crores in non-fund based limits (470 crores currently utilized, largely for the Reliance contract) and 100 crores in fund-based limits (70 crores utilized).

  • The HPCL project is expected to be largely completed by March FY26, while the Reliance project will spill over into Q1 FY27.

  • JNK India is working on a Hydrogen Valley pilot project and exploring partnerships with European firms to stabilize technology for Compressed Biogas (CBG) plants.

  • BPCL Bina; Execution is on track, booked zero revenue from it till date. Might book a small part
    in Q4, but 50% to 60% of the revenue will be booked in FY27.

  • A significant prospect for FY27 is the expansion of the Dangote Refinery in Nigeria, which is doubling its capacity. JNK India previously executed all fired heaters for the existing refinery.

Fired Heaters Contract 10 yrs back, $140 Million Current prices estimated to have nearly doubled
Timeline Q3 FY27 Expected order finalization for long-lead items
Fertilizer Reformers $30 - $40 Million per stream Four streams planned; JNK is qualified
6 Likes

JNK already supplied -13 fired heaters and key CDU/CCR heaters to the existing Dangote refinery, which significantly increases the probability that it participates meaningfully in any second 750,000 b/d refinery expansion, making it a high-conviction repeat-order TAM case, TAM for dangote 2nd. phase could be 2000-2500 cr for JNK.

4 Likes


Most likely the BPCL pending order , my estimate is its around 500 cr as per management commentary in last concall.

5 Likes
Date Facility Name Location (City, Country) Facility Type Incident Type Root Cause Equipment Damage
12-Mar-2024 Lukoil Nizhny Novgorod Refinery Kostovo, Russia Oil Refinery Ukrainian drone strike on crude oil processing unit Military attack (Ukraine-attributed) Crude oil processing unit fire; large-scale fire
15-Jan-2025 Lukoil Volgograd Refinery Volgograd, Russia Oil Refinery Unit 18 fire & explosions Internal mechanical interference (per Russian reports) Unit 18 damaged; 2 heat exchangers destroyed
14-Sep-2025 Kirishi Refinery (KINEF) Leningrad region (near St. Petersburg), Russia Oil Refinery Ukrainian drone strike; debris-sparked fire Military attack (Ukraine-attributed) Fire damage to processing units; main units operational
3-Oct-2025 Chevron El Segundo Refinery California, USA Oil Refinery Refinery fire incident Equipment failure (under investigation) Fire in unit (specifics unclear)
1-Nov-2025 Lukoil-Kstovo/SIBUR Petrochemical Complex Nizhny Novgorod, Russia Petrochemical Plant Ukrainian drone attack on SIBUR facility Military strike (Ukraine-attributed) Fire in southeast industrial zone; dual-facility target
1-Mar-2026 Esmeraldas Refinery Esmeraldas, Ecuador Oil Refinery SEVIA unit fire Equipment failure in steam-extraction vacuum-distillation unit SEVIA (Steam-Extraction Vacuum Distillation) unit destroyed
5-Mar-2026 Petromax Refining Channelview, Texas, USA Oil Refinery Pump seal failure & fire Mechanical seal failure Pump/seal assembly; minor piping damage
6-Mar-2026 Ras Tanura Oil Refinery Saudi Arabia Oil Refinery Fire incident (Iran-Israel war strikes) Military strike (Iran-attributed) Refinery equipment damage (extent unclear)
12-Mar-2026 LyondellBasell Bayport Plant Texas, USA Petrochemical Complex Industrial fire in feedstock processing units Equipment/process failure (under investigation) Feedstock processing units damage
17-Mar-2026 Pemex Olmeca Refinery Perimeter (Dos Bocas) Tabasco, Mexico Oil Refinery Perimeter fire from oily water (aguas aceitosas) overflow during heavy rains Heavy rainfall caused hydrocarbon/water mixture overflow at storage perimeter Perimeter wall damage; secondary containment failure
23-Mar-2026 Valero Port Arthur Refinery Texas, USA Oil Refinery Diesel hydrotreater unit explosion & fire Equipment failure (under investigation) Diesel hydrotreater destroyed; control room damage
2-Apr-2026 Pemex Olmeca Refinery (Dos Bocas) Tabasco, Mexico Oil Refinery Gas leak report (FALSE ALARM) Water vapor from scheduled maintenance work None (no actual incident)
3-Apr-2026 ONGC Mumbai High Platform (Offshore) Offshore Mumbai, India Oil & Gas Platform Sudden fire on shallow-water platform Equipment malfunction (under investigation) SHP (Shallow-Water Platform) equipment damage
3-Apr-2026 Primorsk Port Oil Terminal & Infrastructure Leningrad region (Baltic), Russia Oil Export Terminal Multiple drone/air strikes on port infrastructure Military attack (Ukraine-attributed) Port terminal fires; oil export storage damaged; loading infrastructure destroyed
4-Apr-2026 Lukoil Nizhni Novgorod Refinery (NORSI) Kostovo, Russia Oil Refinery Ukrainian drone strike; crude distillation fire Military attack (Ukraine-attributed) Crude distillation unit damaged; processing capacity reduced
7-Apr-2026 Bhilai Steel Plant Power Plant-2 Durg, Chhattisgarh, India Steel Mill Thermal Power Turbine explosion & fire (STG-4 unit explosion) Turbine section mechanical failure; sudden explosion 25 MW turbine unit (STG-4); piping damage; electrical damage
9-Apr-2026 Pemex Olmeca Refinery (Dos Bocas) Tabasco, Mexico Oil Refinery Petroleum coke storage warehouse fire Spontaneous ignition (likely; under investigation) Coke warehouse; localized damage only
14-Apr-2026 Vedanta Sakti Power Plant Chhattisgarh, India Thermal Power Plant High-pressure boiler steam tube rupture/explosion Excessive fuel accumulation in boiler furnace; pressure build-up Boiler Unit damaged; high-pressure steam tube destroyed
15-Apr-2026 Viva Energy Geelong Refinery Geelong, Victoria, Australia Oil Refinery Fire & explosions Likely technical failure (no evidence of sabotage per authorities) One of Australia’s two major refineries; operational impact
18-Apr-2026 HPCL Pachpadra Refinery Rajasthan, India Oil Refinery Fire during commissioning Equipment malfunction (under investigation) New facility commissioning units affected
21-Apr-2026 CET Vest Thermal Power Plant Bucharest, Romania Power Plant Transformer explosion & fire Unknown (under investigation) 3 transformers destroyed; 30 tons transformer oil burned
Facility Name Operational Impact Recovery Status Economic Impact Geopolitical Context
Lukoil Nizhny Novgorod Refinery Operations suspended at hit unit Repair timeline unclear Russian oil export reduction Ukraine-Russia war; Ukrainian drone campaign start
Lukoil Volgograd Refinery Unit offline; throughput reduction Repairs planned Russian refining capacity loss Russia refining vulnerability
Kirishi Refinery (KINEF) Throughput reduction; capacity degraded Repairs underway (ongoing Russian campaign targets) Russian oil export revenue loss Ukraine-Russia energy war (5th attack on Kirishi since Mar 2024)
Chevron El Segundo Refinery Operational disruption; West Coast jet fuel market impact Repairs ongoing US West Coast jet fuel market tightening US refining capacity; California fuel supply
Lukoil-Kstovo/SIBUR Petrochemical Complex Petrochemical production disruption Recovery ongoing Russian petrochemical exports reduced Ukraine-Russia campaign (dual facility complex)
Esmeraldas Refinery 60-day state of emergency declared; major capacity loss Long-term reconstruction Critical for Ecuador fuel independence; major economic impact Ecuador energy sovereignty; Latin America refining
Petromax Refining Minimal offsite impact; contained quickly Repaired/restarted Minimal (quick containment) Texas refining safety
Ras Tanura Oil Refinery Operational disruption Recovery ongoing Saudi oil revenue impact Iran-Israel war; Hormuz chokepoint strikes
LyondellBasell Bayport Plant Production disruption at facility Repairs in progress US petrochemical supply impact US refining/petrochemical capacity
Pemex Olmeca Refinery Perimeter (Dos Bocas) Minor - perimeter event; main refinery operations continued Perimeter repair ongoing; containment upgraded Crude oil spill (~3 million barrels into Rio Seco); environmental remediation; worker compensation Mexico refining infrastructure vulnerability; Tabasco flooding climate resilience
Valero Port Arthur Refinery Unit offline; diesel production halted at facility Repairs underway; timeline extended US diesel supply tightening; repair costs millions US refining capacity; Gulf market impact
Pemex Olmeca Refinery (Dos Bocas) No operational impact; false alarm only N/A None Mexico facility safety perception
ONGC Mumbai High Platform (Offshore) SHP operations suspended briefly; production interrupted Operations resumed after safety check Production loss for 24-48 hours India offshore oil production; supply continuity
Primorsk Port Oil Terminal & Infrastructure Oil export terminal shutdown; Russian seaborne oil export halted Port repairs complex; timeline extended 40% of Russian seaborne oil export capacity disrupted (2M bpd); massive revenue loss Ukraine-Russia energy war; Baltic export route disruption
Lukoil Nizhni Novgorod Refinery (NORSI) Operations suspended at hit unit; crude throughput reduced Repair timeline unknown Russian oil export revenue loss Ukraine-Russia energy war (sustained campaign)
Bhilai Steel Plant Power Plant-2 Power plant offline; 25 MW capacity lost; steel production affected Repairs ongoing; safety audit underway SAIL production impact; worker compensation Rs. 15L per injured India industrial capacity; steel production
Pemex Olmeca Refinery (Dos Bocas) No operational impact; refinery continued operations Immediate control achieved Minor responder injury treatment Mexico fuel self-sufficiency narrative
Vedanta Sakti Power Plant Plant emergency shutdown; 600 MW unit offline Long-term repairs planned Rs. 35 Lakh per family (compensation); plant shutdown impact India power generation crisis; Chhattisgarh electricity
Viva Energy Geelong Refinery Significant operational disruption; critical for fuel supply Recovery underway Australian fuel supply crisis; East coast dependence on Singapore/India refiners Australia refining crisis (only 2 refineries remain)
HPCL Pachpadra Refinery Commissioning delayed; new capacity offline Commissioning resuming Major - delays fuel independence strategy India refining capacity concerns; Hormuz disruption
CET Vest Thermal Power Plant Grid instability; 3000+ apartment blocks without heating/power Under restoration Significant grid repair costs Romania-EU energy resilience

Compiled a list of Refineries that got attacked recently.

4 Likes

Few more updates on JNK :

Projects | JNK Chemdist JNK has majority stake in Chemdist jv. Projects looks interesting on this site. Chemdist side order is around 100 cr as of last concall.

India announced fuel blends for Aviation.

JNK already has done some work in SAF , I am not sure what exactly it is, but this is the data from previous con-calls.

JNK India Ltd’s Order for Pengerang Biorefinery Project (Malaysia) - Sustainable Aviation Fuel (SAF)

JNK India secured a significant order (classified as 0-50 Cr value) from promoter JNK Global Co. Ltd., Korea for the Pengerang Biorefinery project owned by Pengerang Biorefinery Sdn. Bhd. (a JV of PETRONAS, Enilive S.p.A., and Euglena Co. Ltd.). This biorefinery produces Sustainable Aviation Fuel (SAF / biojet), Hydrogenated Vegetable Oil (HVO / renewable diesel), and bio-naphtha from waste/residue feedstocks (e.g., used cooking oil, animal fats). Capacity: ~650,000 tonnes/year of renewable feedstock. Project timeline: FID in 2024, groundbreaking Nov 2025, operational in H2 2028.

Order Details (from Announcement dated 06 Feb 2025)

  • Scope: Residual Engineering, Procurement, Fabrication, Supply, and transportation till FOB Mundra Port, India. Plus per diem assistance for Erection, Commissioning, and Performance Tests.

  • Equipment Supplied (Process Heaters):

    Equipment Description
    Treating Heater Key heating unit for initial feedstock processing.
    Isomerization Combined Feed Heater Heater for isomerization process (improves fuel properties).
    Product Fractionator Reboiler Heater Reboiler for fractionator to separate products like SAF/HVO.
  • Delivery Schedule: April 09, 2026 (FOB Mundra).

Management Commentary (Q3 FY25 Concall, 18 Feb 2025)

  • Arvind Kamath (Chairperson & Whole-Time Director): “Entering Q4 FY25, the momentum has picked up with a significant order secured in January 2025 from JNK Global Company Limited Korea. This contract for the Pengerang biorefinery project in Malaysia includes a residual engineering, procurement, fabrication and supply of critical fire heaters along with assistance in erection, commissioning and performance testing. This order represents another step in strengthening our global presence and demonstrates our ability to win high-value international projects and this will be the first order for JNK India to Malaysia.”

Tailwinds are increasing for Jnk.
1.⁠ ⁠Globally enemies are destroying the existing refineries .
2.⁠ ⁠⁠Energy sovereignty means every major country would like to have their own refineries at some point in time.
3.⁠ ⁠⁠SAF is getting prominence in India.

DSCL : Holding and added recently, plan to add more on dips.

8 Likes


Large order so its in 100-300 range, my guess is around ~200 cr here.

The Dangote order for the new refinery project is still awaited. However, this is relevant only if JNK has secured the contract. As of now, there is no confirmation on whether JNK has won the order. We only know that JNK has participated in the bidding process and is considered to have a strong chance of winning, given its successful execution history with Dangote.

Dangote has already started awarding contracts for the refinery project. BHEL received certain orders from Dangote project last week, as seen below.

2 Likes

30-35% topline growth for fy 27 without counting new orders.

6 Likes

So, according to the management, 25-30% revenue growth guidance was based solely on the starting order book and new bookings have the potential to increase the revenue growth to 35% or as high as 60%. If they are able to do ~40% sales growth with 14% EBITDA margin then EBITDA can grow ~74% in FY27. PAT too can grow at a similar pace since finance costs are largely working capital based and will most likely scale up in line with revenue growth and depreciation is not too material given the nature of the business. At a P/E ratio of 42.8x and a potential PAT growth of ~74% if the export orders come their way, the stock is available at a PEG ratio of less than 0.6x which looks quite cheap. Of course, this will all be dependent on the pace of order booking and execution.

Additionally, one of the reasons the stock has been trading at a discount to other capital goods companies has been its negative CFO due to increased working capital requirements primarily due to PSU clients which have high receivables and bank guarantees. Importantly, about 3/4th of JNK’s cash on books has been encumbered to provide FD backed bank guarantees to clients which has been the key reason for its negative CFO. However, of the Rs. 1,960 crore starting order book for FY27, more than Rs. 1,600 crore is subcontracted rom JNK Global where no BGs are involved. Therefore, there’s a high probability that JNK’s CFO will turn positive this year as it starts to book revenue from this order book.

9 Likes

~200cr Incinerator Package order from ADNOC’s TA’ZIZ Salt Project got cancelled. (Link)
Per filing, JNK failed to get mandatory approval from project’s tech licensor (either Thyssenkrupp nucera or Technip)

1 Like

The company has mentioned in its exchange filing that “This will have no impact on the declared revenue or associated profits”

However, my understanding is that, this will have impact on this year’s (i.e. FY 27) revenue & profit projections (even though the management I said there is no impact on revenue and profit)

Correct me if I am wrong

Note: Invested, views are biased.

Good numbers from JnK , Bidding pipeline is healthy.

6 Likes

In spite of such a good result why is the share down.